This is Stephen's personal Yesod instance. Across 2,155 runs, the ledger metered real cost on 1,289 of them; the rest are cost-blind or ran on subscription plans, so the all-time figure is a labeled estimate, not a measurement. Captured Aug 17, 2026.

Metered spend$1,235.041,289 costed runs
Est. cost-blind runs~$1,420866 unmetered runs
Estimated all-time~$2,655metered + estimate

Metered spend by model

Metered = sum of captured per-run cost. Estimate for cost-blind runs uses the same-model average cost per run, or the fleet average when a model was never metered. Runs on subscription coder plans meter $0 here; the real subscription outlay is additional. These aggregates come from the factory's run ledger; the long-term source is the SigNoz observability pipeline. Per-model detail lives on the scoreboard.