The factory, over time
Change Log
Yesod changes in bounded development waves. Each wave has a purpose, repository baseline, stopping condition, and evidence-backed result. These entries are reproduced verbatim from the book's durable wave ledger — written as the waves happened, not reconstructed afterward.
Wave by wave, newest first
Ten waves
Universal Intake and the Project Fleet
The Conductor and the Deterministic Refinery
August 7–9, 2026—from the redesign document through Conductor migration, three-lane proof, idempotent repository onboarding, and the self-explaining live refinery surface
The Legible Factory
opened August 7, 2026; this entry records the opening checkpoint rather than a completed exit
Identity, Idleness, and the Quiet Factory
opened August 2, 2026; this entry records the opening checkpoint rather than a completed exit
Dogfooding the Factory on TTRAC
Integration Branches and Bounded Intelligence
The Crash-Only Factory
July 20, 13:55 to July 26, 13:37 PDT—5 days 23 hours 43 minutes
The Async Gate and the Operator Surface
July 15, 11:13 to July 20, 20:18 PDT—5 days 9 hours 5 minutes
The Self-Hosting Exit
July 13, 15:21 to July 14, 17:15 PDT—25 hours 54 minutes